㈠ 为报告外国老板,请英语好的达人帮翻译一个小总结,专业的术语括号备注了,不要机器在线翻译,希望地道一
本人于2009年4月加入BV公司,一直从事工程师工作,从开始负责中国产品到最近三年国外产品,回首这些年工作,有成功的喜悦,有与同事协同攻关的艰辛,在工作中不断加强业务理论知识的学习,能够理论联系实际,运用自己掌握的专业知识结合到实际工作中,并能带领和培养新来的工程师尽快投入到工作中。现将去年到现在主要工作业绩总结如下:
I have been working as an engineer since joining BV Company in April 2009; I started with taking charge of Chinese procts and then switched to foreign procts for the past three years. Looking back on this period, there was sweetness of success and bitterness of tackling problems together with peers, the constant improvement of my theoretical knowledge on the job and the integration of theory into practice by applying my professional knowledge to actual work, as well as the trainings and guidance of new engineers so as to make them get down to work as soon as possible. I hereby summarize below, my job performances from last year until the present
1. 主导BG产品从上海转移到成都的质量工作:
1)确定各工序控制点,检验要求和SPC监控,与上海的同事协商一致后按深圳量产要求固化在QCFC中。
2)建立各工序关键参数CPK定期review机制。
3)制定QA标准
4)定期内部Audit,顺利完成客户对深圳产线的稽核。现已得到客户出货的许可通知。
5)参与转产过程重大品质问题的处理,并及时完成品质总结报告。
1. Leading the role of ensuring the quality of BG procts in the transfer from Shanghai to Cheng:
a) Determined the various process control points, inspection requirements, SPC monitoring and then fixed them into QCFC in accordance with the Shenzhen quantity proction demand after the negotiated consensus with Shanghai peers.
b) Established crucial CPK parameters of various processes and regular review mechanism.
c) Formulated QA standards.
d) Concted regular internal audits, successfully completed the customer’s inspection of the Shenzhen proction lines. Now the notice of shipment permission from customer had been received.
e) Participated in the handling of major quality problems in the course of the proction switch, and ly completed the final report on quality.
2. 系统流程review工作:
1)重新审定公司标准管流程,在文件中引入金样(Golden Sample)和工作样品(working sample)的认可机制,完善了系统文件。
2)北京E-data上传给客户方式由人工手动上传变为FIS系统自动上传,避免人为疏漏导致客户投诉。
2. The review work on system flow:
a) Reexamined the company’s standard management flow; the approval systems for Golden Sample and Working Sample had been included and thus, the system file was perfected.
b) The upload of Beijing’s E-data to customers was changed from manual to FIS system automatic upload, this would avoid customer complaints e to human errors.
3. 顺利完成其它重大项目质量转产工作:
3. Successfully completed the quality work on proction switch of other major projects.
4. 质量成本改善:
1)主导上海的 PCB板回收利用工作,小组成员通过验证确定回收方案并已实施,为公司节约99%以上的报废PCB。
2)连接头(connector)端面(end face)不良改善
4. Quality cost improvements:
a) Responsible for the recycling of PCB boards in Shanghai; The plan had been determined and implemented after verification by the recycling group members, saving above 99% of the rejected PCB for the company.
b) Improvement on the end face defects of the connector.
5. 主导上海 工程师小组日常工作:
1)主要产品FPY均有提升
2)在客户品质表现均为B以上
3)RMA 和重大品质异常及时完成。
4)新PFMEA如期开展
5)工程师个人业务水平提高
6)带领和培养新工程师4人,并达到公司要求。
5. Responsible for leading the daily operations of the Shanghai engineer group:
a) There was enhancement on major FPY procts.
b) The customer quality performances were B and above.
c) Duly rectified RMA and major quality abnormalities.
d) New PFMEA commenced on schele.
e) Improvement to the professional skills of indivial engineer.
f) Responsible for the training and guidance of 4 new engineers and had attained the company requirements.
6. 协助公司QCC活动开展
1)培训产线员工和ME品质工具的应用。
2)对QCC小组进行辅导和诊断,在公司和外部发表中获得优异成绩。
6. Assisted in the launching of company’s QCC activities:
a) Provided trainings to the proction line workers and the application of ME quality tools.
b) Concted coaching and diagnosis on QCC group; received excellent results in the internal and external published reports.
注:本文对您的业务事关重大,要谨慎选择答案。本人的翻译不敢说完美,但应该能应付您的所需。请注意您开头这句“从开始负责中国产品到最近三年国外产品….”,日期是否有错,因为2009年至今也只是刚达2年。
【英语牛人团】